Oak & Lime Exteriors
Unit 2, Sample Yard Winchester SO23 9AB
01962 496 0123 · hello@example.com
Quotation
Q-024
- Dated
- 30 October 2026
- Valid until
- 29 November 2026
Prepared for
Alex Morgan
24 Orchard Road Winchester SO23 9AB
07700 900123 · alex@example.com
Where the work is
24 Orchard Road Winchester SO23 9AB
Your reference: Sample job
Scope
1 elevation · 34 m² net · Monocouche
The look
Ivory
What’s included
Every item, priced. Sections with more than one item are subtotalled.
| Preparation | Qty | Rate | Amount |
|---|---|---|---|
| Wash down Pressure and fungicidal wash of the whole face, so the render has something clean to grip. | Qty34 m² | Rate£2.50 | Amount£85.00 |
| SBR / manufacturer bonding coat SBR or the manufacturer bonding coat. Not PVA. Evens out how thirsty the wall is, so the render goes off at the same rate all over. | Qty34 m² | Rate£3.00 | Amount£102.00 |
| Preparation subtotal (2 items) | £187.00 | ||
Finish
| Materials | Qty | Rate | Amount |
|---|---|---|---|
| Monocouche render Ivory, scraped finish. The colour runs right through the render, so there is nothing to paint now or later. Colour is ordered in one batch so it matches across elevations. A later top-up can be a different batch. Quantity includes 10% for cutting and waste. | Qty37.4 m² | Rate£14.00 | Amount£523.60 |
| Beads, PVC-u The neat edges, in PVC-u: corner beads on every arris, stop beads at the windows and doors, and a bell bead to throw the water clear at the base, plus movement beads. | Qty24 m | Rate£4.50 | Amount£108.00 |
| Materials subtotal (2 items) | £631.60 | ||
| Labour | Qty | Rate | Amount |
|---|---|---|---|
| Monocouche application Applied in 1 coat and finished scraped, by hand, over the wall left once the windows and doors are taken off. | Qty34 m² | Rate£40.00 | Amount£1,360.00 |
Access and extras
| Access | Qty | Rate | Amount |
|---|---|---|---|
| Scaffold Put up, hired for the length of the job, and taken down again. | Qty12 m | Rate£22.00 | Amount£264.00 |
| Extras | Qty | Rate | Amount |
|---|---|---|---|
| Skip hire Delivered, filled and taken away. A council permit, if the skip sits on the road, is not in this price. | Qty1 each | Rate£280.00 | Amount£280.00 |
| Travel One charge for the job, however many days we are on site. | Qty1 job | Rate£60.00 | Amount£60.00 |
| Extras subtotal (2 items) | £340.00 | ||
Notes
Sample note: sheet down, and leave the site clear each evening.
Total inc VAT
£3,339.12
- Deposit due
- £1,001.74
- Balance on completion
- £2,337.38
How to accept
Reply to Oak & Lime Exteriors on 01962 496 0123 / hello@example.com quoting Q-024.
I accept this quote for £3,339.12 and ask the firm to go ahead on the terms shown.
Your full name
Or sign here and hand this page back
Accepted by
Date
Standards
The standards this work is carried out to
- External rendering is carried out in accordance with BS EN 13914-1 (design, preparation and application of external rendering).
- Proprietary systems (monocouche, silicone and acrylic thin-coat) are applied to the system specification, using the matching basecoats, mesh, beads and primers.
- Coloured render is ordered in one batch so the colour matches across the elevations. A later top-up can be a different batch, and that extra is priced separately.
- Render is applied within the weather window on the system sheet, out of frost, heavy rain and direct hot sun. One common sheet prints about 5 °C to 30 °C, and other sheets differ. Start and finish dates may move with the weather.
- Scaffolding, towers and other access are included only when they are listed on this quote. If they are not listed, they are arranged by others and are not in this price.
- Any workmanship guarantee is the one set out in our terms. If our terms are not attached to this quote, ask us for them in writing before you accept it.
- Movement beads are fitted at 3–4 m centres and at every change of substrate; corner, stop and bell beads are fitted at all arrises, reveals and drips.
- The substrate must be sound, clean and stable. Hidden defects uncovered after hack-off (loose brickwork, damp, failed DPC) are priced separately and agreed before we proceed.
- This quotation is indicative. Areas, heights and plinth millimetres are the figures typed on this quote. The picture is a look at the finish on your photo, not a measured survey, and we do not invent quantities from it.
- Check whether a conservation area, a listed building or an Article 4 direction applies. A change of colour or finish may need consent.
- Re-rendering more than half of an elevation, or more than a quarter of the building envelope, can trigger Part L of the Building Regulations. This quote is for the render finish, not an insulation upgrade, unless an EWI allowance is listed.
- VAT is charged at the standard rate of 20% unless this quote shows a different rate. A reduced or zero rate only applies to qualifying work with evidence (HMRC VAT Notice 708).
Terms
This quotation is valid until 29 November 2026 and is based on the details recorded above; work not listed is excluded unless agreed in writing. Prices in GBP. Item prices exclude VAT; VAT at 20% is added in the totals above. A deposit of £1,001.74 is payable to secure the booking; the balance is due on completion.
Sample terms: the deposit shown above is due on booking, the balance on completion. Any additional work is quoted separately before it starts.
As it is now

Colour sample

The proposed work
Your new render
A colour sample on this photograph, not a photograph of finished work.This picture is a look, not a survey. It is a colour sample on your own photo, not a photograph of finished work. It does not invent defects or measurements from the picture.End of quotation Q-024